Labette Health Hospital
Watson & Sons was awarded a floor resurfacing project in Parsons, Kansas, where we utilized our new piece of pumping equipment to perform a self-leveling floor installation. The material pumped, a well-known construction material called Sika Level 325, covered over 12,000 sq ft of flooring on multiple floors throughout the hospital. In addition, our team took extra precautions to keep the construction zone separated from the rest of the building, allowing this service to be performed while maintaining the clean working environment needed for the hospital to continue daily operations.